Progress in Brescia: COP.A.G.’s Storage Facility Takes Shape Under the CESCO EPC Flag

CESCO EPC has successfully completed a new grain storage and rapid bulk dispatch plant for COP.A.G. in Brescia, Italy.

Designed as a compact, multifunctional structure, the project integrates grain storage, the client’s milling process, and bulk feed flour dispatch into a single optimized facility. While the milling equipment was supplied by the client, the entire structure was engineered by CESCO EPC to accommodate its seamless integration, including dedicated technical areas for process equipment and electrical control systems.

Project highlights:
✔️ 10 smooth wall square storage cells
✔️ Separate storage for grains and milled feed products
✔️ Elevated structure for direct truck loading
✔️ Hygienic smooth wall design with common walls to eliminate dead spaces
✔️ Hot dip galvanized steel structure with insulated technical enclosure
✔️ Complete engineering, structural design, fabrication, and installation by CESCO EPC

The project demonstrates CESCO’s capability to design industrial structures that not only provide storage but also become an integral part of our customers’ production process, maximizing available space, improving logistics, and supporting future process integration.

At CESCO EPC, we believe that the best industrial plants are those where structural engineering and process engineering are developed together from the very beginning.

Planning a grain storage or handling facility in Europe? Our team is available to discuss your project requirements. Contact us here