Livestock starts with feed. Feed starts with grain. And grain needs infrastructure built to last.
Every tonne of feed on show in EuroTier 2026 starts as grain that someone received, dried, stored, and moved without loss.
That’s where CESCO EPC works. In Europe alone: 20+ references in 7+ countries, with close to 870.000 t of storage capacity.
What it looks like on the ground:
🇺🇦 Ukraine: nine inland grain terminals delivered between 2011 and 2021, from general layout engineering for MHP to equipment supply for Convex / Epicentr K. Together: 760,000 t of storage, with conveying lines up to 400 t/h.
🇮🇹 Italy: Molino Chiavazza (Cuneo): 25,000 t of storage and 400 t/h conveying, with mixed train and truck intake. La Sanfermese (Mantova): an integrated receiving, drying, and storage plant for 26,000 t. Molino Valente (Alessandria) and Valman (Vicenza): homogenization and dosing plants built around mills that keep running.
🇸🇪 Sweden: an oat mill building with round and square silos for Lantmännen in Kimstad, together with AFRY.
🇷🇸 Serbia and 🇷🇴 Romania: a 20,000 t sunflower seed terminal in Srpski Itebej, and turnkey corn cob drying and seed production plants.
🇩🇪 Germany: a 400 t/d wheat milling plant for Interstarch in Zeitz.
Different crops, climates and scales. One method: in-house engineering, a single point of responsibility, from conceptual design to commissioning.
From 10 to 13 November, CESCO EPC team will be at EuroTier in Hannover. If you produce feed, run a cooperative, or plan new storage capacity, bring your crop, tonnage, and site plan. We will bring the references.
Planning storage or a feed-mill upgrade for 2027? Book 30 minutes with our team at EuroTier 2026.