by admin | 29 May 2026 | Noticias
In high-capacity grain terminals, a chain conveyor is one of the most loaded pieces of equipment in the plant. It runs for hours. It carries volume. And when it stops unexpectedly, the entire flow stops with it. The CC420 is engineered for exactly that environment. At...
by admin | 21 May 2026 | Noticias
Structural engineers design performance. Every load case, every connection detail, every finite element calculation serves one purpose: ensuring the facility behaves as engineered, under full grain load, under wind pressure, under seismic conditions, for the full...
by admin | 19 May 2026 | Noticias
On 14 and 15 May at the Ramada Hotel in Panama City, GRAINOVA 360 brought together developers, operators, and technical decision-makers from across the region. The questions on the table were direct: how to increase storage capacity, how to structure EPC projects that...
by admin | 13 May 2026 | Noticias
CESCO EPC has been awarded a new contract for the execution of a fully integrated grain receiving, drying, storage, and dispatch terminal for our long-standing partner La Sanfermese in Mantova, Italy. This project represents another important milestone in a...
by admin | 11 May 2026 | Noticias
As highlighted during the discussion, grain infrastructure is not just logistics; it is a strategic asset. With domestic wheat production significantly reduced and import dependency reaching up to 50 percent of national demand, ensuring efficient, reliable, and modern...